No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

KunLun 9016 V100R001 User Guide 12

This document describes the appearance, specifications, parameters, and structure of the KunLun 9016, and how to install an OS, replace parts, and install, remove, configure, and troubleshoot the server.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing the CME

Removing the CME

Scenarios

Remove the central management enclosure (CME) if the CME or a component inside the CME has failed.

Prerequisites

Conditions

No special conditions are required for this operation.

Data

No data preparation is required for this operation.

Tools

  • ESD gloves
  • Packaging materials, for example, an ESD bag
  • Phillips screwdriver

Procedure

  1. Turn off the switches on the PDUs corresponding to the central management enclosure (CME).
  2. Remove all cables from the CME.
  3. Remove all modules from the CME.

  4. Open the protective covers on the corners at the front of the CME, and loosen the screws that secure the CME. See step (1) in Figure 6-1.
  5. Gently remove the CME. See step (2) in Figure 6-1.
  6. Place the removed CME in an ESD bag.

    Figure 6-1 Removing a CME

Translation
Download
Updated: 2019-05-20

Document ID: EDOC1000111827

Views: 74382

Downloads: 245

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next