No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

KunLun 9016 V100R001 User Guide 12

This document describes the appearance, specifications, parameters, and structure of the KunLun 9016, and how to install an OS, replace parts, and install, remove, configure, and troubleshoot the server.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Precautions for Connecting Cables

Precautions for Connecting Cables

Before connecting cables to the server, ensure that the power distribution frame (PDF) in the equipment room and the power distribution units (PDUs) in the cabinet are switched off.

Two delivery modes are selectable for the 9016:

  • Preassembled shipment

    Power and signal cables have been installed in the cabinet before shipment. During onsite installation, you only need to push the cabinet to a specified location in an equipment room.

  • Disassembled shipment

    Install cables in the cabinet onsite according to the cable labels.

The server may use the following types of cables:

  • Ground cable
  • Cables to a mouse, keyboard, and video graphics array (VGA) port
  • Network cable
  • Serial cable
  • Power cables

Table 3-11 describes the precautions for connecting cables.

Table 3-11 Precautions for connecting cables

Item

Specifications

Connecting a power cable

Determine the output terminals of the PDF in the equipment room.

Connecting a ground cable

Select a ground cable depending on the equipment room environment, and connect the cable.

Checking cable connections

Check that all cables are correctly connected and connectors are properly installed. For details, see Verifying Cable Connections.

Translation
Download
Updated: 2019-05-20

Document ID: EDOC1000111827

Views: 74315

Downloads: 245

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next