No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

KunLun 9016 V100R001 User Guide 12

This document describes the appearance, specifications, parameters, and structure of the KunLun 9016, and how to install an OS, replace parts, and install, remove, configure, and troubleshoot the server.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Capacity Expansion from 9016-12P to 9032-32P

Capacity Expansion from 9016-12P to 9032-32P

Procedure

  1. The procedure is the same as that of Capacity Expansion from 9016-16P to 9032-32P.
  2. Install SCMs in SCE2-BPUB, SCE 3, and SCE 4 based on the actual capacity expansion requirement. For details, see Installing an SCM.
  3. Install NCMs in SCE 2, SCE 3, and SCE 4. For details, see Installing an NCM.
  4. Install NI cables and PIP cables that adapt to a 9032-32P. For details, see Installing and Removing Cables.
Translation
Download
Updated: 2019-05-20

Document ID: EDOC1000111827

Views: 74818

Downloads: 245

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next