No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Log Reference

S9300, S9300E, and S9300X V200R010C00

This document provides the explanations, causes, and recommended actions of logs on the product.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
TUNN_PS/5/SMOOTH_SUCCESS

TUNN_PS/5/SMOOTH_SUCCESS

Message

TUNN_PS/5/SMOOTH_SUCCESS:Tunnel PS finished smoothness successfully.

Description

The data smoothing of the protection group ended.

Parameters

Parameter Name Parameter Meaning
None None

Possible Causes

After the active/standby switchover, data smoothing ended.

Procedure

  1. This log message indicates a normal situation, and no action is required.
Translation
Download
Updated: 2019-08-21

Document ID: EDOC1000142069

Views: 576460

Downloads: 37

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next