No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Log Reference

S9300, S9300E, and S9300X V200R010C00

This document provides the explanations, causes, and recommended actions of logs on the product.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
ALML/3/CANNODE_POWEROFF

ALML/3/CANNODE_POWEROFF

Message

ALML/3/CANNODE_POWEROFF:The CANbus node of [STRING] is powered off.

Description

The CANbus node is powered off.

Parameters

Parameter Name Parameter Meaning
STRING Information of the board where the CANbus node is located. For example, describe the information of a board through the board name, board type, or board slot ID.

Possible Causes

The power off slot slotid command is run to power off a board.

Procedure

  1. Check whether the board is powered off using a command for routine maintenance.
    • If so, the alarm handling ends.
    • If not, go to step 2.
  2. Run the power on command to power on the board.
Translation
Download
Updated: 2019-08-21

Document ID: EDOC1000142069

Views: 579253

Downloads: 37

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next