Configuration Task Summary
Table 3-3 describes the link aggregation configuration tasks.
Scenario | Task |
---|---|
Switches Directly Connected Through Link Aggregation |
Perform either of these two operations: |
Switches Connected Across a Transmission Device Through Link Aggregation |
|
A Switch Connecting to a Server Through Link Aggregation |
Perform either of these two operations: |
A Switch Connecting to a CSS Through Link Aggregation |
|
Using E-Trunk to Implement Link Aggregation Across Devices |
These two operations must be performed: |