No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Exhausting Nitrogen
Exhausting Nitrogen
Context
Before welding refrigerant pipes, fully
exhaust nitrogen from the refrigerant pipes to avoid explosion and
injuries.
Procedure
Remove the bonnet of the low-pressure needle
valve shown in Figure 3-30 and connect
the pressure gauge leather hose to the needle valve.
Figure 3-30 Exhausting nitrogen
(1) Low-pressure needle valve
(2) Exhaust pipe needle valve
(3) Liquid pipe needle valve
Open the pressure gauge valve. Loud noises of air flow
are generated at first and then disappear gradually.
After the air is exhausted, remove the pressure
gauge and install the valve bonnet.
Continue exhausting nitrogen from the exhaust pipe needle
valve and liquid pipe needle valve by performing 1–3.