No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Preparing for Power-On
Preparing for Power-On
Procedure
Verify that the smart cooling product switch in the upstream
power distribution cabinet (PDC) is OFF.
Verify that the input voltage meets the requirement.
Ensure that there is no reverse or open
phase for the input power cable of the smart cooling product. Otherwise,
the smart cooling product may be damaged beyond repair.
Verify that the L1, L2, L3, N, and PE wires are connected
to the indoor and outdoor units in correct phase sequence.
Verify that the signal cable between the indoor and outdoor
units is properly connected.
Verify that the water sensor is properly installed.
If teamwork networking is required, verify that the teamwork
cable is correctly connected.
Verify that the cable connections and DIP switch settings
of the T/H sensors are correct.
If humidifier is required, verify that the main water inlet
valve is open.
Verify that the humidifier water inlet pipe and drainpipe
are correctly connected, refrigerant pipes are connected, and refrigerant
has been precharged.
Verify that fan switches Fan1–Fan10 are turned on.