No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro 2288H V5 Server V100R005 Maintenance and Service Guide 07

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
About This Document

About This Document

Purpose

This document describes the physical structure, parts installation and removal procedures, appearance, and specifications of the 2288H V5 rack server.

Intended Audience

This document is intended for:

  • Huawei technical support engineers
  • Technical support engineers from channel partners
  • Enterprise administrators

Symbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol

Description

Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results.

NOTICE is used to address practices not related to personal injury.

Calls attention to important information, best practices, and tips.

NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration.

Change History

Issue

Date

Description

07

2019-08-10

  • Added the support for the Cascade Lake processors.

06

2018-11-30

  • Refined the document for easy use.

05

2018-10-30

  • Refined the document for easy use.

04

2018-09-04

  • Added informaion about the 20 x 2.5" (8 x SAS/SATA + 12 x NVMe) drive configuration.

03

2018-04-18

  • Added TPM specifications.
  • Added built-in drive specifications.
  • Modified operating temperature specifications.

02

2017-12-29

  • Added the NVMe drive configuration information.

01

2017-08-13

  • This issue is the first official release.
Download
Updated: 2019-08-06

Document ID: EDOC1000163549

Views: 64101

Downloads: 1165

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next