No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - Reliability

CloudEngine 12800 and 12800E V200R002C50

This document describes the configurations of Reliability, including BFD Configuration, VRRP Configuration, DLDP Configuration, Smart Link and Monitor Link Configuration, EFM Configuration, and CFM Configuration.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Load Balancing in a Smart Link Group

Load Balancing in a Smart Link Group

Smart Link prevents loops in dual-homing networking; however, the link utilization is only 50% because only one uplink is active at one time. Smart Link provides the load balancing function to improve link utilization.

Figure 5-12 Load balancing in a Smart Link group

In Figure 5-12, a load balancing instance is configured and associated with VLAN 300 to VLAN 400. Data packets of VLAN 300 to VLAN 400 are forwarded through the backup link of SwitchD. VLAN 100 to VLAN 200 are not associated with the load balancing instance, so packets of these VLANs are forwarded through the primary link. In this way, traffic from different VLANs is shared between the two links, improving link utilization.

Translation
Download
Updated: 2019-03-21

Document ID: EDOC1000166606

Views: 100969

Downloads: 85

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next