No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - Reliability

CloudEngine 12800 and 12800E V200R002C50

This document describes the configurations of Reliability, including BFD Configuration, VRRP Configuration, DLDP Configuration, Smart Link and Monitor Link Configuration, EFM Configuration, and CFM Configuration.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Link Switching Failure in a Smart Link Group

Link Switching Failure in a Smart Link Group

Possible Causes

Data flows are locked to the master or slave interface.

Procedure

  1. Check configuration of the Smart Link to see whether data flows are locked on an interface.

    Run the display smart-link group group-id command and check the Link status field in the command output.

    If the Link status field displays lock or force, data flows are locked to the master or slave interface. Run the undo smart-link { force | lock } command to remove the lock.

Translation
Download
Updated: 2019-03-21

Document ID: EDOC1000166606

Views: 121186

Downloads: 90

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next