No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - Reliability

CloudEngine 12800 and 12800E V200R002C50

This document describes the configurations of Reliability, including BFD Configuration, VRRP Configuration, DLDP Configuration, Smart Link and Monitor Link Configuration, EFM Configuration, and CFM Configuration.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Combination of Smart Link and Monitor Link

Combination of Smart Link and Monitor Link

Smart Link can only detect failures of links directly connected to member interfaces. For example, Interface1 and Interface2 of SwitchD in Figure 5-13 constitute a Smart Link group. Smart Link can only detect failures of the link between Interface1 and SwitchB or the link between Interface2 and SwitchC. If the uplink between SwitchB and SwitchA fails, Smart Link cannot detect this failure and does not trigger a link switchover, leading to traffic loss.

If you configure Monitor Link on the upstream devices, Smart Link can detect a link failure on upstream devices and quickly switch traffic to the backup link. The combination of Smart Link and Monitor Link expands the application scope of Smart Link and allows for improved flexibility in networking.

Figure 5-13 Combination of Smart Link and Monitor Link

In Figure 5-13, Smart Link is configured on SwitchD and SwitchE. If the link between SwitchB and SwitchD or the link between SwitchC and SwitchE fails, Smart Link can detect the failure and quickly switch traffic to the backup link. To enable SwitchD and SwitchE to detect link failures between SwitchA and SwitchB or between SwitchA and SwitchC, configure Monitor Link on SwitchB and SwitchC.

As an example, the Smart Link group on SwitchD contains Interface1 and Interface2, whereas the Monitor Link group configured on SwitchB contains uplink interface Interface5 and downlink interfaces Interface3 and Interface4. When the Monitor Link group detects a failure of the uplink, it shuts down the downlink interfaces. A link switchover is then triggered in the Smart Link group on SwitchD. When the uplink on SwitchB recovers, downlink interfaces are enabled automatically so that SwitchD can detect the change of the uplink status.

Translation
Download
Updated: 2019-03-21

Document ID: EDOC1000166606

Views: 92074

Downloads: 84

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next