No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade
CX920 Switch Module V100R001 User Guide 09
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On or Off a Switching Plane

Powering On or Off a Switching Plane

This topic describes how to power on or off the 10GE switching plane and 40GE switching plane of CX920.

Scenarios

Remotely power on the 10GE switching plane and 40GE switching plane of CX920 using the MM910 WebUI.

Use any of the following methods to power on the CX920:

  • Power on all switching planes of the CX920 on the MM910 WebUI. Details are provided later in this topic.
  • On the MM910 CLI, run the powerstate command to power on or off the switching planes of the CX920. For details, see MM910 Management Module V100R001 Command Reference.
  • On the BMC CLI, run the powerstate command to power on or off the switching planes of the CX920. For operation details, see E9000 Server V100R001 iBMC User Guide.
  • If the chassis is not powered on, power it on, and all the switching planes of the CX920 will be powered on with the chassis. This topic does not provide the operation details.
  • If the chassis is powered off, the 10GE switching plane and 40GE switching plane of the CX920 are powered off with the chassis.
  • If the chassis is powered on but the CX920 is not installed, install the CX920, and all switching planes of the CX920 are automatically powered on after installation. This topic does not provide the operation details.
  • If the chassis is powered on and the CX920 is installed, remove the CX920 to power off the 10GE switching plane and 40GE switching plane.

Impact on the System

After the 10GE switching plane and 40GE switching plane are powered off, all services that run on the 10GE switching plane and 40GE switching plane stop.

Prerequisites

Conditions

The current configuration data has been saved.

Software

PuTTY.exe is free software. You can download it from the Internet. PuTTY 0.60 or later is required for login over a serial port.

Procedure

  1. The RS–232 serial port on the PC is connected to the serial port marked with SYS on the CX920 panel.
  2. Power on or off switching planes on the MM910 WebUI.

    1. Log in to the MM910 WebUI.

      For details, see Logging In to the MM910 WebUI.

    2. Choose Pem&Fantray.

      The Pem&Fantray page is displayed.

    3. In the navigation tree on the left of the Pem&Fantray page, choose Power Supply Management > Power Control. See Figure 6-4.
      Figure 6-4 Power Control page
    4. Power on or off the 10GE switching plane and 40GE switching plane of a specific switch module.
    5. Refresh the page and check the latest power-on and power-off status of the switch module.

Translation
Download
Updated: 2019-12-04

Document ID: EDOC1000170901

Views: 25098

Downloads: 184

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next