No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

MZ620 NIC V100R001 User Guide 04

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Appearance

Appearance

The MZ620 can be installed in slot Mezzanine1 (Mezz1 for short) or Mezzanine2 (Mezz2 for short) on a half-width compute node or in slot Mezz1, Mezz2, Mezzanine3 (Mezz3 for short), or Mezzanine4 (Mezz4 for short) on a full-width compute node. The MZ620 provides network ports for connecting to switch modules.

  • If the MZ620 is installed in slot Mezz1 or Mezz3, its two 100G ports connect to switch module slots 2X and 3X respectively.
  • If the MZ620 is installed in slot Mezz2 or Mezz4, its two 100G ports connect to switch module slots 1E and 4E respectively.
Figure 1-1 Appearance of the MZ620
Figure 1-2 MZ620 installation positions on a half-width compute node

Figure 1-3 MZ620 installation positions on a full-width compute node

Translation
Download
Updated: 2019-01-26

Document ID: EDOC1000172487

Views: 3185

Downloads: 77

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next