No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage V100R006C10 Block Storage Service Parts Replacement 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Replacing a PCIe Card

Replacing a PCIe Card

You can configure a 10GE Peripheral Component Interconnect Express (PCIe) card that provides 2 x 10GE optical ports.

Impact on the System

Before replacing a PCIe card, you must power off the storage node. This will adversely affect the services running on the node. Exercise caution when performing this operation.

Prerequisites

  • The replacement PCIe card is ready.
  • You have opened the cover to take out the PCIe card that resides in the storage node.

Precaution

  • storage node.
  • Only professional technical support engineers are allowed to replace a NIC.
  • A storage node has two power modules. Ensure that both are disconnected.

Tools and Materials

  • Flat-head screwdrivers
  • Electrostatic discharge (ESD) gloves
  • ESD wrist straps
  • ESD bags
  • Labels

Procedure

  1. Wear an ESD wrist strap or ESD gloves.
  2. Use the KVM to log in to the operating system of the node, enter user name root and its password (default: Root@storage), and run poweroff command to power off the node.

    Wait until the KVM has no output. The power-off is complete.

  3. Remove all power cables and external signal cables.
  4. Remove the storage node from the cabinet.
    1. Loosen the captive screws on the panel using a Phillips screwdriver, as shown in step 1 in Figure 4-145.

      Figure 4-145  Removing a storage node

    2. Slowly pull the storage node out along the guide rails, as shown in step 2 in Figure 4-145.
    3. Press the release buttons on both sides and pull the storage node out of the cabinet along the guide rails, as shown in step 3 in Figure 4-145.
  5. Remove the enclosure cover.
    1. Use a flat-head screwdriver to loosen the latch that secures the ejector lever of the enclosure cover, as shown in step 1 in Figure 4-146.
    2. Open the ejector lever to push the enclosure cover backward, as shown in step 2 in Figure 4-146.

      Figure 4-146  Removing an enclosure cover

  6. Remove the PCIe card.
    1. Open the latch on the PCIe card, as shown in step 1 Figure 4-147.

      Figure 4-147  Removing a PCIe card

    2. Slowly pull out the PCIe card upwards, as shown in step 2 in Figure 4-147.
  7. Put the removed PCIe card into an ESD bag.
  8. Take the replacement PCIe card out of its ESD bag.
  9. Install the PCIe card.
    1. Insert the PCIe card into the expansion slot (note that the interface model must match), as shown in step 1 in Figure 4-148.

      Figure 4-148  Installing a PCIe card

    2. Close the latch on the PCIe card, as shown in step 2 in Figure 4-148.
  10. Install the enclosure cover.
    1. Place the enclosure cover horizontally, align it with the fixing slots on both side panels of the enclosure, and close the ejector lever, as shown in steps 1 and 2 in Figure 4-149.

      Figure 4-149  Installing an enclosure cover

    2. Tighten the latch to secure the ejector lever of the enclosure cover using flat-head screwdriver, as shown in step 3 in Figure 4-149.
  11. Put the storage node into the cabinet.
    1. Arrange at least four persons to lift the storage node on both sides, align the inner rails on the storage node with the holding rails, and push the storage node into the cabinet along the holding rails, as shown in Figure 4-150.

      Figure 4-150  Pushing a storage node into holding rails

    2. Press the release buttons on both sides, and push the storage node into the cabinet until the storage node cannot move forward, as shown in Figure 4-151.

      Figure 4-151  Pushing a storage node into a cabinet

    3. Tighten the two captive screws on the mounting ears to secure the storage node, as shown in Figure 4-152.

      Figure 4-152  Securing a storage node

  12. Connect the storage node to the power sockets and peripheral devices according to the cable connection labels. Then power on the storage node.
  13. Execute the following script to check the storage node status.

    cd /opt/product/deploy/script

    ./envcheck.py

    The normal self-check result is as follows:

    [2014-11-05 16:45:02,491][INFO    ][module:envcheck, line:0620] 
    ********************************************************************************
    Check Item: SNAS Environment Check Summary
    Check Pass:True
    Check Cmd :
    Check Info:
    kernel version: OK
    nvdimm driver: OK
    TOE driver: OK
    HardRaid status: OK
    Firewall status: OK
    Command Output:
    ********************************************************************************
    

  14. Check whether the network ports on the storage node are named SLOT4-0, SLOT4-1, SLOT5-0, and SLOT5-1.
    1. On the KVM, run ifconfig -a to check whether the network ports on the storage node are named SLOT4-0, SLOT4-1, SLOT5-0, and SLOT5-1.

      • If yes, the PCIe card is successfully replaced
      • If no, go to 14.b.

    2. Run reboot to restart the storage node, so that new PCIe cards can be identified.
  15. On DeviceManager, check the status of the storage node.
    1. Start the browser on the maintenance terminal and log in to DeviceManager.
    2. In the Alarms area on the home page, check whether a new alarm is reported.

      • If yes, clear the alarm according to the alarm help.
      • If no, go to 15.c.

    3. On the right of the home page, click System to go to the System page.
    4. Click Device View tab to go to the Device View page.
    5. In Nodes, check the status of the node that is newly added to the cluster.

      • Health Status: Normal
      • Running Status: Online

Follow-up Procedure

After replacing the PCIe card, label the replaced PCIe card to facilitate subsequent operations.

Translation
Download
Updated: 2019-02-01

Document ID: EDOC1000175242

Views: 10830

Downloads: 1

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next