No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage V100R006C10 File Storage Service Software Installation Guide 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Overview

Overview

This section describes how switches are planned and configured on an IB network.

Network Planning

Three storage nodes, four SX6018 switches, and one CE5800 series switch are used in the following example. Figure 4-3 shows network planning.

Figure 4-3  Network planning (IB networking)

Table 4-4 shows switch planning examples. The planning values are only for your reference and are italic texts in commands. You can replace them based on site requirements.

Table 4-4  Network planning example

Name

Example

(Optional) Management network switch

VLAN: 200

Mgmt ports: 1/0/1 to 1/0/3

NIC1 or NIC3 ports: 1/0/45 to 1/0/47

IPv4 address of a management switch: 10.10.10.12/255.255.255.0

IPv6 address of a management switch: fec0:1::4/64

Network management IPv4 address: 10.10.10.13

Network management IPv6 address: feco:1::5

Other Networks

If the customer's network is not the preceding network, configure it by referring to the corresponding sections.

If the customer needs to plan uplink ports for management network switch for connecting to other switches, contact Huawei technical support to customize a configuration solution based on the site requirements.

Obtaining Switch-relevant Documents

This document uses the switch versions that match the delivered storage devices as an example to explain how to configure the switches. For details about the switch versions, see the FusionStorageVersion Mapping.

If the switch version is different one, follow instructions the corresponding document to complete the configuration.

Link to SX6018 switch documents: http://www.mellanox.com/page/products_dyn?product_family=150&mtag=sx6015_sx6018

To obtain the CE5800 series switch document:For enterprise users, log in to http://support.huawei.com/enterprise. For carrier users, log in to http://support.huawei.com. Enter CloudEngine 5800 in the search box, and click the path displayed below the search box to enter the product page.

Translation
Download
Updated: 2019-03-28

Document ID: EDOC1000175257

Views: 8773

Downloads: 3

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next