No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - Device Management

S1720, S2700, S5700, and S6720 V200R011C10

This document describes the principles and configurations of the Device Management features, and provides configuration examples of these features.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
How Can I Specify a Switch in a Stack as the Master Switch?

How Can I Specify a Switch in a Stack as the Master Switch?

To manually specify a member switch as the master, power on that switch first, and then wait 20 seconds before powering on the other switches.

The master election timeout period is 20 seconds. The length of time each member switch spends in startup may differ significantly. Therefore, when the stack is powered on or restarts, not all member switches participate in the master election. Member switches that start more than 20 seconds later than the first switch to complete startup cannot be elected the master switch.

Translation
Download
Updated: 2019-10-21

Document ID: EDOC1000178167

Views: 210128

Downloads: 1005

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next