No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - IP Unicast Routing

S7700 and S9700 V200R011C10

This document describes IP Unicast Routing configurations supported by the switch, including the principle and configuration procedures of IP Routing Overview, Static Route, RIP, RIPng, OSPF, OSPFv3, IS-IS(IPv4), IS-IS(IPv6), BGP, Routing Policy ,and PBR, and provides configuration examples.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Configuring a NET and Enabling IPv6 IS-IS

Configuring a NET and Enabling IPv6 IS-IS

Context

NET is the special form of the network service access point (NSAP). After the IS-IS view is displayed, IS-IS can start only when a NET is configured for an IS-IS process.

Generally, you only need to configure one NET for an IS-IS process. When an area needs to be redefined, for example, the area needs to be merged with other areas or divided into sub-areas, configure multiple NETs to ensure route correctness. A maximum of three area addresses can be configured for an IS-IS process. Therefore, a maximum of three NETs can be configured for an IS-IS process. When configuring multiple NETs, ensure that their system IDs are the same.

IS-IS can run on an IPv6 topology only when IPv6 is enabled on an IS-IS process.

Procedure

  1. Run system-view

    The system view is displayed.

  2. Run isis [ process-id ]

    The IS-IS process view is displayed.

  3. Run network-entity net

    A NET is configured.

    NOTE:

    Configuring NETs based on loopback interface addresses is recommended to ensures that a NET is unique on the network. If NETs are not unique, route flapping will easily occur.

    An area ID is used to uniquely identify an area in the same IS-IS domain. All routers in the same Level-1 area must share the same area ID, while routers in the same Level-2 area can have different area IDs.

  4. Run ipv6 enable

    IPv6 is enabled for the IS-IS process.

Translation
Download
Updated: 2019-04-01

Document ID: EDOC1000178324

Views: 224343

Downloads: 195

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next