Installation Guide

OceanStor 5000, 5000F, 6000, and 6000F V5 Series V500R007

This document is applicable to OceanStor 5110 V5, 5110F V5, 5300 V5, 5300F V5, 5500 V5, 5500F V5, 5600 V5, 5600F V5, 5800 V5, 5800F V5, 6800 V5, and 6800F V5 storage systems. It describes hardware installation of those storage systems for helping you easily and quickly finish the installation.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Cabinets Installation (for FR42612L Cabinet)

Cabinets Installation (for FR42612L Cabinet)

The steps involved in installing cabinets in non-securing mode include positioning cabinets, laying out cabinets, securing cabinets, leveling cabinets, combining cabinets.

Prerequisites

The following tools are required:

  • Multimeter
  • Flat-head screwdriver, Phillips screwdriver, and adjustable wrench
  • Measuring tape, marker, powder marker, level, and angle square
  • Ladder

Meters and dedicated tools must be proof reading and calibrated before being used.

Procedure

  1. Check the installation environment and materials before installing cabinets.

    1. Check whether the device types and quantity are the same as those described in the packing list.
    2. Check whether the cabinet exterior is in good condition and free of collision and scratch.
    3. Check whether the area, height, and ground bearing capacity of the installation position meet related requirements.

  2. Determine and outline the installation positions.

    1. Check the engineering drawings to determine the positions for installing the cabinets. Align the measuring tape with the upper edge of the installation position, and mark the upper edge by using a marker.
    2. Use the powder marker to outline the positions for installing the cabinets.

      Figure 5-29 shows the outline of the position for installing one cabinet.

    Figure 5-29 Outline of the position for installing one cabinet

    Figure 5-30 shows the outlines of the positions for installing combined cabinets.

    Figure 5-30 Outlines of the positions for installing combined cabinets

  3. Roll the cabinet along its castors to the installation position and position it.

    1. Roll the cabinet to the outlined installation position.
    2. Align the cabinet edges with the outlined lines by using an angle square, as shown in Figure 5-31.
    Figure 5-31 Laying the cabinet in the installation position

    NOTE:

    Ensure that the left and right edges of the cabinet and the outer edge of the rear door are aligned with the floor outline when positioning the cabinet by using an angle square.

  4. Secure the cabinet on the floor using the leveling feet.

    1. Open the front and back doors, as shown by step 1 in Figure 5-32.
    2. Rotate the four leveling feet clockwise by using a Phillips screwdriver to lower the leveling feet, as shown by step 2 in Figure 5-32.
    3. Rotate the M12 bolts at the bottom of the leveling feet clockwise by using an adjustable wrench to ensure that the leveling feet contact the ground and the castors hang in the air, as shown by step 3 in Figure 5-32.
      Figure 5-32 Securing a cabinet

      NOTE:
      • Spin the castors by using a Phillips screwdriver. If the castors rotate freely, they are hanging in the air.
      • H indicates the height from the cabinet top to the ground. The adjustable height range of the support foot is 1995 mm to 2005 mm. The height of the support foot can be adjustable.
    4. Make sure that the heights measured from the front, rear, right, and left of the cabinet are the same.

  5. Adjust the levelness and verticality of the cabinet by raising or lowering the leveling feet.

    1. Use a level and plumb line respectively to measure the levelness and verticality of the cabinet, as shown in Figure 5-33.
    2. If the cabinet is not level, use an adjustable wrench to raise or lower the leveling feet.
    Figure 5-33 Leveling a cabinet

    NOTE:
    • Check the levelness in the front of the cabinet and at the rear of the cabinet.
    • Method of checking levelness: Lay a level. If the bubbles are in the middle of the level when they are static, the position you want to check is level.

  6. (Optional) After securing and leveling two or more cabinets, combine the cabinets. If only one cabinet is installed, skip this procedure.

    1. Remove the screws from the connection plates on the front door and back doors using a Phillips screwdriver, as shown by step 1 in Figure 5-34.
      NOTE:
      • There are four connecting points on the front door and rear door of the middle cabinets.
      • There are two connecting points on the front door and rear door of the side cabinets.
      • Ensure that the vertical deviation and the distance between cabinets are not greater than 3 mm after the cabinets are combined.
    2. Pass the connection plate through the gap on the cabinet door and secure it using the bolt removed in step 1, as shown by step 2 in Figure 5-34.
      Figure 5-34 Leveling a cabinet

    3. Step 3 in Figure 5-34 shows that the cabinets are combined using connecting plates.

Translation
Download
Updated: 2019-07-11

Document ID: EDOC1000181531

Views: 100599

Downloads: 948

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next