Installation Guide

OceanStor 5000, 5000F, 6000, and 6000F V5 Series V500R007

This document is applicable to OceanStor 5110 V5, 5110F V5, 5300 V5, 5300F V5, 5500 V5, 5500F V5, 5600 V5, 5600F V5, 5800 V5, 5800F V5, 6800 V5, and 6800F V5 storage systems. It describes hardware installation of those storage systems for helping you easily and quickly finish the installation.
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Optional) Installing a Quorum Server

(Optional) Installing a Quorum Server

When HyperMetro is deployed, install a quorum server on adjustable guide rails. When HyperMetro is not deployed, skip this section.

Prerequisites

  • The adjustable guide rails apply to racks with 557 mm to 862 mm between the front and rear mounting bars.
  • The quorum server cannot be stacked on the adjustable guide rail.

Procedure

  1. Install guide rails.

    1. Place a guide rail horizontally in the planned position on the mounting bars in the rack. Hook the guide rail to the rack. See step (1) in Figure 5-97.
      Figure 5-97 Installing an adjustable guide rail

      NOTE:

      The three holes in each mounting ear of a guide rail should be within a 1 U mark.

    2. Install the four screws at the front and rear of the guide rail to secure the guide rail. See step (2) in Figure 5-97.
    3. Repeat the preceding operations to install the guide rail on the opposite side.

  2. Install the quorum server.

    1. (Two persons required) Lift the quorum server onto the rack.
    2. Place the quorum server onto the guide rails and push it into the rack, as shown in Figure 5-98.
      Figure 5-98 Installing the quorum server

    3. When the two mounting ears on the quorum server touch the mounting bars on the rack, secure the quorum server by tightening the captive screws on the mounting ears.

Translation
Download
Updated: 2019-07-11

Document ID: EDOC1000181531

Views: 93089

Downloads: 868

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next