Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
change upgrade flow
Parameters
Parameter |
Description |
Value |
---|---|---|
resume_type=? | You must set "resume_type" parameter to run this command. |
|
Usage Guidelines
When upgrade failed, you need use "show upgrade status" to show the status firstly:
- If the status is "Suspended Before Continue", you can use parameter "continue" or "retry" to continue to perform the upgrade ignoring errors or rerun the upgrade.
- If the status is "Suspended Before Rollback", you can use parameter "rollback" or "retry" to perform rollback or rerun the upgrade.
- If the status is "Fault", you can use parameter "repair" to continue to perform the upgrade.
Example
Resume the upgrade.
developer:/>change upgrade flow resume_type=retry DANGER: You will resume the upgrade process. The operation will resume the upgrade process from a failed state. Suggestion: Before you execute this operation, read the upgrade guide and confirm the operation that you have selected. Have you read danger alert message carefully?(y/n)y Are you sure you really want to perform the operation?(y/n)y Command executed successfully.