No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Advanced O&M Command Reference

OceanStor 5000, 5000F, 6000, and 6000F V5 Series V500R007

This document is applicable to OceanStor 5110 V5, 5110F V5, 5300 V5, 5500 V5, 5600 V5, 5800 V5, 6800 V5, 5300F V5, 5500F V5, 5600F V5, 5800F V5, and 6800F V5. Based on the CLI, this document describes how to use various commands classified by functionsand how to set the CLI and manage the storage system through these commands.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
change upgrade flow

change upgrade flow

Function

The change upgrade flow command is used to resume the upgrade.

Format

change upgrade flow resume_type=?

Parameters

Parameter

Description

Value

resume_type=?

You must set "resume_type" parameter to run this command.

  • continue:When upgrade suspended when encounter an error, you can execute this command with this parameter to continue the upgrade ignoring errors.
  • retry:When upgrade suspended when encounter an error, you can execute this command with this parameter to rerun the upgrade.
  • rollback:When upgrade suspended when encounter an error, you can execute this command with this parameter to rollback the upgrade.
  • terminate:When upgrade suspended when encounter an error, you can execute this command with this parameter to terminate the upgrade.
  • repair:If the status is "Fault", you can execute this command with this parameter to continue to perform the upgrade.

Views

Developer view, Upgrade view

Usage Guidelines

When upgrade failed, you need use "show upgrade status" to show the status firstly:

  • If the status is "Suspended Before Continue", you can use parameter "continue" or "retry" to continue to perform the upgrade ignoring errors or rerun the upgrade.
  • If the status is "Suspended Before Rollback", you can use parameter "rollback" or "retry" to perform rollback or rerun the upgrade.
  • If the status is "Fault", you can use parameter "repair" to continue to perform the upgrade.

Example

Resume the upgrade.

developer:/>change upgrade flow resume_type=retry 
DANGER: You will resume the upgrade process. The operation will resume the upgrade process from a failed state. 
Suggestion: Before you execute this operation, read the upgrade guide and confirm the operation that you have selected. 
Have you read danger alert message carefully?(y/n)y 
Are you sure you really want to perform the operation?(y/n)y 
Command executed successfully.

System Response

None

Translation
Download
Updated: 2019-07-11

Document ID: EDOC1000181619

Views: 631873

Downloads: 252

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next