No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH321 V5 Server Node V100R005 Maintenance and Service Guide 07

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Supercapacitor

Installing the Supercapacitor

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH321 V5.

  3. Place the server node on the ESD workstation.
  4. Take the spare part out of its ESD bag.
  5. Determine the position of the supercapacitor.
  6. Vertically insert the supercapacitor into the holder until the supercapacitor is locked.

    Figure 8-23 Installing the supercapacitor

  7. Check whether the supercapacitor is configured with a TFM.

    • If yes, go to 8.
    • If no, go to 9.

  8. Install the TFM.

    1. Remove the screw-in RAID controller card.
      1. Remove the cable from the RAID controller card.

        For details, see Internal Cabling.

      2. Loosen the screws that secure the RAID controller card. See (1) in Figure 8-24.
      3. Remove the RAID controller card from the connector on the mainboard. See (2) in Figure 8-24.
      Figure 8-24 Removing the screw-in RAID controller card
    2. Insert the TFM card into the screw-in RAID controller card. See (1) and (2) in Figure 8-25.
    3. Tighten the screws to secure the TFM card. See (3) in Figure 8-25.
    Figure 8-25 Installing a TFM
    1. Install the screw-in RAID controller card.

      For details, see Installing the Screw-in RAID Controller Card.

    2. Go to 10.

  9. Connect the cable between the supercapacitor and the screw-in RAID controller card.
  10. Install the supercapacitor holder.

    1. Install the supercapacitor holder into the node panel and tighten the screws to secure the supercapacitor holder. See (1) in Figure 8-26.
    2. Install the node panel. See (2) in Figure 8-26.
    3. Tighten the screws to secure the panel. See (3) in Figure 8-26.
    Figure 8-26 Installing the supercapacitor holder

  11. Install the air duct for the supercapacitor.
  12. Install the server node.

    For details, see Installing an XH321 V5.

  13. Power on the server node.

    For details, see Power-On Procedure.

Download
Updated: 2019-12-25

Document ID: EDOC1000183891

Views: 30750

Downloads: 110

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next