No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH321 V5 Server Node V100R005 Maintenance and Service Guide 07

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Battery

Installing the Battery

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH321 V5.

  3. Place the server node on the ESD workstation.
  4. Take the spare part out of its ESD bag.
  5. Determine the position of the battery.

    Figure 8-55 Position of the battery

  6. Remove the PCIe card.

    For details, see Removing a PCIe Card.

  7. Holding the battery with the text side facing upwards, insert the left end of the battery into the slot, and gently press down the whole battery into the slot.

    Figure 8-56 Installing the battery

  8. Install the PCIe card.

    For details, see Installing a PCIe Card.

  9. Install the server node.

    For details, see Installing an XH321 V5.

  10. Power on the server node.

    For details, see Power-On Procedure.

Download
Updated: 2019-12-25

Document ID: EDOC1000183891

Views: 30551

Downloads: 110

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next