No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH321 V5 Server Node V100R005 Maintenance and Service Guide 07

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing an XH321 V5

Installing an XH321 V5

Procedure

  1. Determine the position of the server node in the chassis.

    Figure 8-7 Positions and slot numbers of the XH321 V5 server nodes

    Install the lower server nodes and then the upper server nodes.

  2. Remove filler modules.

    Perform this operation only when filler modules are installed.

    1. Press the ejector release button on the filler module. See (1) in Figure 8-8.
    2. Fully open the ejector lever. See (2) in Figure 8-8.
    3. Holding the ejector lever, pull the filler module from the chassis. See (3) in Figure 8-8.
    Figure 8-8 Removing a filler panel
    1. Close the ejector lever.
    2. Place the filler module in an accessory recycle bin.

  3. Install the server node.

    To prevent device damage or personal injury, hold the bottom of the device with both hands when installing it.

    1. Press the ejector release button on the server node. See (1) in Figure 8-9.
    2. Fully open the ejector lever. See (2) in Figure 8-9.
    Figure 8-9 Opening the ejector lever
    1. Slide the server node into the chassis horizontally. See (1) in Figure 8-10.
    2. Close the ejector lever. See (2) in Figure 8-10.
    Figure 8-10 Installing a server node

  4. Connect the multi-port cable as required.

    1. Press the two tabs on the multi-port cable connector. See (1) in Figure 8-11.
    2. Connect the multi-port cable to the UCP on the server. See (2) in Figure 8-11.
    Figure 8-11 Connecting a multi-port cable

  5. Install optical modules and optical cable as required.

    Replacing the optical cable, network cable, or optical module will interrupt services.

    1. Close the security pin on the optical module, use die-casting pliers to clamp the optical module, and insert it into the optical port until you hear a click.
    2. Use die-casting pliers to clamp the optical connector, and insert it into the optical port of an optical module until you hear a click.

  6. Power on the server node.

    For details, see Power-On Procedure.

  7. Check indicator status.

    For details, see Indicators and Buttons.

Download
Updated: 2019-12-25

Document ID: EDOC1000183891

Views: 30473

Downloads: 110

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next