No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

OceanStor 9000 V300R006C20 Hardware Installation Guide 05

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing L-shaped Adjustable Guide Rails for P25/P12 Nodes

Installing L-shaped Adjustable Guide Rails for P25/P12 Nodes

Before using a third-party cabinet or a Huawei cabinet that has no guide rails and floating nuts installed, you need to install L-shaped adjustable guide rails for P25/P12 nodes.

Prerequisites

  • The cabinet has been installed.
  • All required tools and materials have been ready, including:
    • Phillips screwdrivers (M3 to M6)
    • Markers
    • M6 screws
    • Square-hole positioning pins (for square-hole mounting bars)
    • Round-hole positioning pins (for round-hole mounting bars)

Context

Figure 8-11 shows the L-shaped adjustable guide rails.

Figure 8-11  L-shaped adjustable guide rails

  • Each device is equipped with a pair of adjustable guide rails.
  • The adjustable guide rail to be installed on the left of the cabinet has an L identifier, and the adjustable guide rail to be installed on the right of the cabinet has an R identifier.
  • The adjustable guide rails are 600 mm (23.62 in.) to 900 mm (35.43 in.) long. They are designed to fit into a cabinet with the depth ranging from 800 mm (31.50 in.) to 1100 mm (43.31 in.).

Procedure

  1. Determine the installation positions of the L-shaped adjustable guide rails for P25/P12, as shown in Figure 8-12.

    Figure 8-12  Installing L-shaped adjustable guide rails for P25/P12 nodes

  2. Install L-shaped adjustable guide rails for P25/P12 nodes as shown in Figure 8-13.
    1. Face the cabinet and align the undersides of the adjustable guide rails with the U marks on the front and rear mounting bars.
    2. Extend the adjustable guide rails until the front and rear positioning pins protrude through the holes on the front and rear mounting bars.
    3. Use three M6 screws to secure each L-shaped adjustable guide rail.

    Figure 8-13  Installing L-shaped adjustable guide rails for P25/P12 nodes

Translation
Download
Updated: 2019-03-26

Document ID: EDOC1000185366

Views: 44421

Downloads: 164

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next