No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

OceanStor 9000 V300R006C20 Hardware Installation Guide 05

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installation Process

Installation Process

Learning about the installation process prior to installing OceanStor 9000 will greatly facilitate the subsequent operations.

Figure 2-1 and Table 2-1 respectively provide an installation flowchart and step-by-step instructions.
Figure 2-1  Installation flowchart

Table 2-1  Step-by-step descriptions

Key Step

Description

Installation Preparations

Before installing OceanStor 9000, you must ensure that:
  • All required documents and installation tools are ready.
  • You have verified the installation environment and device specifications.
  • You have planned the networks and created the network diagrams.

Unloading and Transporting Equipment

Operators must better understand safety precautions and choose appropriate tools for unloading and transporting OceanStor 9000.

Unpacking and Checking

When OceanStor 9000 arrives, project supervisors and customer representatives must unpack devices together and check that OceanStor 9000 is intact and the quantity is correct.

Installing FR42612L Cabinet

You are instructed to install the accompanying cabinet.

Checking a Third-Party Cabinet

You must check the cabinet provided by a third party to ensure that it meets device installation conditions.

Installing Components in a Cabinet

You are instructed to install OceanStor 9000 components into a cabinet in sequential order from bottom to top.

Connecting PGND Cables and Power Cables Between Components in a Cabinet

You can proceed to install PGND cables and power cables.

Connecting Signal Cables

You can proceed to install signal cables.

Checking the Installation

Check hardware installation to ensure that devices work properly.

Powering On Devices

You are instructed to power on OceanStor 9000 and verify that OceanStor 9000 is correctly working after power-on.

Translation
Download
Updated: 2019-03-26

Document ID: EDOC1000185366

Views: 49700

Downloads: 172

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next