Configuration Guide - DCN and Server Management

CloudEngine 8800, 7800, 6800, and 5800 V200R003C00

This document describes the configurations of Trill, FCoE, DCB, and NLB Server Cluster Association.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Configuring an FC or FCoE Interface

Configuring an FC or FCoE Interface

Context

Layer 2 Ethernet interfaces can be switched to Fiber Channel (FC) interfaces. The default type of an FC interface is F_Port, and an FC interface can be configured as an NP_Port in an NPort Virtualization (NPV) instance. The NPV switch uses an F_Port to connect to an N_Port of an ENode and uses an NP_Port to connect to an F_Port of an FCoE forwarder (FCF). Fibre Channel over Ethernet (FCoE) supports the VF_Port and VNP_Port. The NPV switch uses a VF_Port to connect to a VN_Port of an ENode and uses a VNP_Port to connect to a VF_Port of an FCF.

Pre-configuration Tasks

Before configuring an FC interface, complete the following task:

  • Connect an FC optical module to the interface.
NOTE:

If the LINK indicator is steady green, the interface is Up.

Procedure

  • Configure an FC interface.

    1. Run system-view

      The system view is displayed.

    2. Run port mode fc interface-type interface-number

      An Ethernet interface is switched to an FC interface.

      By default, no FC interface exists on the device.

    3. Run commit

      The configuration is committed.

  • Configure an FCoE interface.

    1. Run system-view

      The system view is displayed.

    2. Run interface fcoe-port interface-number

      An FCoE interface is created and the FCoE interface view is displayed.

    3. Run quit

      Return to the system view.

    4. Run interface interface-type interface-number

      The view of a physical interface to be added to an FCoE interface is displayed.

    5. Run fcoe-port fcoe-port-id

      The physical interface is added to the FCoE interface.

      By default, an FCoE interface does not contain a physical interface.

    6. Run port link-type { trunk | hybrid }

      The link type of the interface is configured.

      By default, the link type of an interface is access.

    7. Run port trunk allow-pass vlan { { vlan-id1 [ to vlan-id2 ] }&<1-10> | all }

      Or run port hybrid tagged vlan { { vlan-id1 [ to vlan-id2 ] }&<1-10> | all }

      The interface is added to the FCoE VLAN.

      NOTE:

      The interface cannot be removed from VLAN 1.

    8. Run commit

      The configuration is committed.

Follow-up Procedure

Run the display interface fc command to check the FC interface status.

<HUAWEI> display interface fc 1/0/1
FC1/0/1 current state : UP (ifindex: 144)                                                                                           
Line protocol current state : UP
......
Translation
Download
Updated: 2019-05-08

Document ID: EDOC1100004349

Views: 31671

Downloads: 120