Configuration Guide - DCN and Server Management

CloudEngine 8800, 7800, 6800, and 5800 V200R003C00

This document describes the configurations of Trill, FCoE, DCB, and NLB Server Cluster Association.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Configuring an NPV

Configuring an NPV

Pre-configuration Tasks

An NPort Virtualization (NPV) switch is located at the edge of a fabric and between an ENode and an FCoE forwarder (FCF). The NPV switch forwards traffic from the ENode to the FCF.

Before configuring FC NPV, complete the following task:

  • Configure a link layer protocol so that interfaces at both ends of a link are Up.

Before configuring FCoE NPV, complete the following tasks:

  • Configure a link layer protocol so that interfaces at both ends of a link are Up.

  • Configure Data Center Bridging (DCB). After DCB negotiation is successful, configure the FCF and NPV.

Configuration Process

Figure 2-31 NPV configuration flowchart
Translation
Download
Updated: 2019-05-08

Document ID: EDOC1100004349

Views: 32477

Downloads: 120

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next