No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

eSight V300R009C00 Operation Guide 09

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Frame Management

Frame Management

This topic describes how to view and manage equipment frame information.

Prerequisites

An OLT has been added to eSight.

Procedure

  1. Choose Resource > PON from the main menu.
  2. Choose PON Resource > Frame from the navigation tree on the left.
  3. (Optional) Click on the right side and set Name, NE, Software Version and Comments to find the desire frame.
  4. View Name, NE, Frame No, Admin Status, Oper Status, Software Version, and Comments in the list.

Related Operations

Related Operations

Purpose

Export information of selected frame in batches.

Modify comments of frame.

Download
Updated: 2019-05-17

Document ID: EDOC1100011877

Views: 287384

Downloads: 551

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next