No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

eSight V300R009C00 Operation Guide 10

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Device Adaptation Management

Device Adaptation Management

A method is provided for adapting eSight to devices, and the adaptation packages are separated from the eSight software and can be loaded on demand, reducing the software package size.

Context

eSight provides the centralized online management and O&M functions for device adaptation packages, and uses the adaptation layer solution to address the version interoperability with NEs. After an NE upgrade, users only need to install the adaptation layer of the NE version to manage the new NE version, without a linked eSight and NE upgrade that causes service interruptions. During an adaptation package installation, eSight provides network management services properly. The installation of a new adaptation package has no impact on online users who do not use the adaptation package.

Only devices developed by Huawei are supported and the adaptation package must meet the enterprise wireless interface specifications.

Prerequisites

  • You have logged in to the eSight client.
  • You have been assigned the operation rights.
  • You have obtained the adaptation package file.

Procedure

  1. Choose Resource > eLTE > eLTE System Settings > Device Adaptation Management from the main menu.

    Perform the following operations on the Device Adaptation Management page.

    Task

    Operator

    Install

    Click, On the displayed page, Click in Adaptation Package Path and choose a device adaptation package.Click OK.

    NOTE:
    • For details about the adaption package, see the release notes of each NE.
    • By default, the maximum number of uploaded adaptation package files is 100.

    Delete

    You can perform this operation to delete device adaptation packages.

    • Delete a single device adaptation package.
      1. Click next to the target task.
      2. Click Confirm in the Warn dialog box.
    • Delete device adaptation packages in a batch.
      1. Select history configuration tasks you want to delete.
      2. Click.
      3. Click Confirm in the Warn dialog box.

Precautions

  • Local /Remote High Availability System (SUSE Linux + Oracle + Veritas)
  1. eSight automatically restarts after the device adaptation package is deleted. To prevent the switchover to the standby node, log in to the active node as the root user before uninstalling the adaptation package, and the following command to freeze AppService resources:

    # hagrp -freeze AppService -sys Host name

  2. After the eSight restart is completed, run the following command to unfreeze the resources:
    NOTE:

    Before unfreezing the resources, ensure that eSight has restarted, which may take 10 to 20 minutes.

    # hagrp -unfreeze AppService -sys Host name

  • Local High Availability System Software Installation Guide (SUSE Linux + MySQL + OMMHA)
    1. eSight automatically restarts after the device adaptation package is deleted. To prevent the switchover to the standby node, log in to the active node as the ossuser user before uninstalling the adaptation package, and run the following command to disable the switchover:

      > cd /opt/ommha/ha/bin

      > ./forbiden_switch.sh forbiden 30

      30 in the preceding command indicates that the switchover is disabled for 30 minutes.

    2. After the eSight restart is completed, run the following command to enable the switchover.
      NOTE:

      Before enable the switchover, ensure that eSight has restarted, which may take 10 to 20 minutes.

      > cd /opt/ommha/ha/bin

      > ./forbiden_switch.sh cancel

Translation
Download
Updated: 2019-09-07

Document ID: EDOC1100011877

Views: 311078

Downloads: 635

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next