No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Huawei SAP HANA Appliance Two Node Installation Guide (RH5885H and RH8100 V3+Redhat) 09

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
dd

dd

Table 1-4 describes the internal disk planning for the RH5885H V3 sizing 1 TB configuration for example.

Table 1-4 Internal disk planning

Partition

File System

Partition Size

Description

Raid virtual disk0

-

600 GB

Used to install the OS

swap

swap

20 GB

part of virtual disk0

/boot

ext4

1 GB

part of virtual disk0

/usr/sap

ext4

50 GB

part of virtual disk0

/

ext4

Remaining space

part of virtual disk0

Raid virtual disk1

-

Other space except the OS

-

/hana/ data

xfs

3 TB

part of virtual disk1

/hana/ log

xfs

800 GB

Used to store Log. If the server uses ES3000 V3 NVMe PCIe SSD card, /hana/ log will be mount to the SSD card. Otherwise, it will be mount to virtual disk1.

/hana/ shared

xfs

Remaining space

part of virtual disk1

Translation
Download
Updated: 2019-06-17

Document ID: EDOC1100019155

Views: 20806

Downloads: 99

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next