No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Huawei SAP HANA Appliance Two Node Installation Guide (RH5885H and RH8100 V3+Redhat) 08

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Hardware Planning

Hardware Planning

Table 1-1 describes the hardware planning for SAP HANA.

Table 1-1 Hardware planning

Type

Hardware Model

Description

Server

Two RH5885H V3 or RH8100 V3 servers

Provide computing resources.

General-purpose server

Functions as the NTP server to synchronize time between cluster nodes.

10GE switch

S6700

Supports service and HA networking.

Management switch

S5728

Supports equipment management and HA networking.

Cable

  • Power cable
  • PGND cable
  • 10GE stacking cable
  • Ethernet cable
  • Optical cable

Connect physical devices in the system.

Translation
Download
Updated: 2019-05-14

Document ID: EDOC1100019155

Views: 20653

Downloads: 99

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next