Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Commissioning Preparations

Commissioning Preparations

Before commissioning the equipment, you must be familiar with the relevant safety precautions. In addition, you must ensure that the required tools, instruments, references, and engineering design documents are available.

Making Documents Available

Equipment commissioning requires the following documents:

  • Hardware Description
  • Alarms and Performance Events Reference
  • Feature Description

Making Tools Available

  • U2000
  • BER tester
  • SDH analyzer
  • SmartBits
Translation
Download
Updated: 2019-01-21

Document ID: EDOC1100020976

Views: 46962

Downloads: 388

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next