No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

OSN 500 550 580 V100R008C50 Commissioning and Configuration Guide 02

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
System Commissioning

System Commissioning

After the equipment is connected to the relevant network, test whether the equipment is connected to the other equipment in the network properly and whether the indexes are normal.

Translation
Download
Updated: 2019-01-21

Document ID: EDOC1100020976

Views: 45765

Downloads: 381

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next