No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer G5500 Server G560 V5 Compute Node Maintenance and Service Guide 03

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Optional) Installing the Supercapacitor

(Optional) Installing the Supercapacitor

Procedure

  1. Power off the G560 V5. For details, see Powering Off the Compute Node.
  2. Remove the G560 V5. For details, see Removing the G560 V5.
  3. Place the G560 V5 on the ESD floor.
  4. Remove the cover. For details, see Removing the Cover of the G560 V5.
  5. Determine the location for installing the supercapacitor. See Figure 5-79.

    Figure 5-79 Location of the supercapacitor

  6. Take a spare supercapacitor out of its ESD bag.
  7. Press the plastic latch in the arrow directions, and push the supercapacitor into the supercapacitor tray. Ensure that the supercapacitor is secured by the plastic latch. See (1) and (2) in Figure 5-80.

    Figure 5-80 Installing the supercapacitor

  8. Place the supercapacitor tray vertically on the mainboard, align the screw holes on the supercapacitor tray with those on the mainboard, and tighten the screws using a Phillips screwdriver. See (1) and (2) in Figure 5-81.

    Figure 5-81 Installing the supercapacitor tray and connecting the cable

  9. Connect the power cable between the supercapacitor and RAID controller card. See (3) in Figure 5-81.
  10. Install the cover. For details, see Installing the Cover of the G560 V5.
  11. Install the G560 V5. For details, see Installing the G560 V5.
  12. Power on the G560 V5. For details, see Powering On the Compute Node.
Translation
Download
Updated: 2018-12-14

Document ID: EDOC1100031432

Views: 27878

Downloads: 44

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next