No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer G5500 Server G560 V5 Compute Node Maintenance and Service Guide 03

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Cover of the GS608

Installing the Cover of the GS608

Procedure

  1. Place the GS608 on the ESD floor.
  2. Align the nailheads on the cover with the U-shaped slots in the GS608 case, and place the cover vertically on the GS608. See (1) in Figure 5-26.

    Figure 5-26 Installing the cover of the GS608

  3. Push the cover to the front of the GS608 until you hear a click sound, indicating that the cover is installed. See (2) in Figure 5-26.
Translation
Download
Updated: 2018-12-14

Document ID: EDOC1100031432

Views: 23846

Downloads: 39

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next