No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer G5500 Server G560 V5 Compute Node Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing an M.2 FRU

Installing an M.2 FRU

Procedure

  1. Determine the position for installing an M.2 FRU. See Figure 5-44.

    Figure 5-44 Positions of M.2 FRUs

  1. (Optional) Remove the drive filler module.
  2. Take an M.2 FRU out of its ESD bag.

    Figure 5-45 M.2 FRU

  3. Hold the handle of the M.2 FRU and push the M.2 FRU into the M.2 adapter slot. See (1) in Figure 5-46.

    For slots where you do not want to install M.2 FRUs, install M.2 FRU filler panels to shield electromagnetic radiation.

    Figure 5-46 Installing an M.2 FRU

  4. Close the handle of the M.2 FRU. See (2) in Figure 5-46.
  1. Check the M.2 FRU indicator status.

    If the M.2 FRU fault indicator is off, the M.2 FRU is operating properly. For details, see Front Panel Indicators and Buttons.

Translation
Download
Updated: 2018-12-14

Document ID: EDOC1100031432

Views: 33759

Downloads: 48

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next