No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer G5500 Server G560 V5 Compute Node Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Optional) Installing a USB Flash Drive

(Optional) Installing a USB Flash Drive

Installing a USB Flash Drive on the Front Panel

  1. Determine the location for installing the USB flash drive. See Figure 5-94.

    Figure 5-94 Position of the USB flash drive

  2. Take a spare USB flash drive out of its ESD bag.
  3. Insert the USB flash drive into the port on the G560 V5. See Figure 5-95.

    Figure 5-95 Installing a USB flash drive

Installing the USB Flash Drive on the Mainboard

  1. Power off the G560 V5. For details, see Powering Off the Compute Node.
  2. Remove the G560 V5. For details, see Removing the G560 V5.
  3. Place the G560 V5 on the ESD floor.
  4. Remove the cover. For details, see Removing the Cover of the G560 V5.
  5. Determine the location for installing the USB flash drive. See Figure 5-96.

    NOTE:

    There are two built-in USB ports. Only the upper USB port is available, and the lower USB port is not for use.

    Figure 5-96 USB port

  6. Take a spare USB flash drive out of its ESD bag.
  7. Insert the USB flash drive into the port on the G560 V5. See Figure 5-97.

    Figure 5-97 Installing a USB flash drive

  8. Install the cover. For details, see Installing the Cover of the G560 V5.
  9. Install the G560 V5. For details, see Installing the G560 V5.
  10. Power on the G560 V5. For details, see Powering On the Compute Node.
Translation
Download
Updated: 2018-12-14

Document ID: EDOC1100031432

Views: 33719

Downloads: 48

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next