No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer G5500 Server G560 V5 Compute Node Maintenance and Service Guide 03

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
System Reliability

System Reliability

The following system reliability requirements must be met for the server:

  • To ensure normal heat dispassion, the chassis can run only when nodes or filler modules are installed in the slots. Ensure that none of the front slots of the chassis is empty.
  • If you do not need to install a CPU in a socket, install a CPU protective cover in the socket. If only one CPU is required, install it in socket CPU 1. CPU 1 must be configured with DIMMs; otherwise, the compute node cannot be powered on.
  • Install air ducts above DIMM slots.
  • Ensure that the BIOS battery supplies power properly.
Translation
Download
Updated: 2018-12-14

Document ID: EDOC1100031432

Views: 24008

Downloads: 39

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next