No relevant resource is found in the selected language.
Your browser version is too early. Some functions of the website may be unavailable. To obtain better user experience, upgrade the browser to the latest version.
The automatic subtitle function is from the YouTube plug-in. The translation is for reference only.
SupportDocumentation
Product followed successfully.
Failed to follow the product.
Loading...
(Video) FusionModule1000B Prefabricated Modular Data Center Commissioning Video (Colo Scenario)
Related Version
Translation
简体中文
Favorite
Favorited
Download
Feedback
Published On: 2019-02-23Views: 3168Downloads: 447Document ID: EDOC1100032444Description:
This video describes how to power on and commission the FusionModule1000B prefabricated modular data center solution in terms of power-on commissioning preparations, checking items and precautions, power-on check, power-on commissioning, and joint commissioning. This video also describes the power-on commissioning, joint commissioning, and power-off methods for core components of the solution. It provides you a quick grasp of the commissioning method.
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document.
Note: Even the most advanced machine translation cannot match the quality of professional translators.
Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Video) FusionModule1000B Prefabricated Modular Data Center Commissioning Video (Colo Scenario)