No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

XH321L V5 Server Node V100R005 Maintenance and Service Guide 02

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On the XH321L V5

Powering On the XH321L V5

  • The server node has been installed and the chassis is not powered on.

    Power on the chassis. The XH321L V5 is also powered on.

  • The chassis is powered on and the XH321L V5 is not installed.

    The XH321L V5 powers on automatically after it is installed.

  • The chassis is powered on, and the XH321L V5 is installed but is not operating properly.

    Hold down the power button on the node panel for 6 seconds until the XH321L V5 is powered off, and then press the power button to power it on again.

  • You want to power on the XH321L V5 over the iBMC CLI in remote management mode.

    Run the ipmcset -d powerstate -v 1 command on the iBMC CLI to power on the XH321L V5 remotely.

  • You want to power on the XH321L V5 over the iBMC WebUI.

    On the iBMC WebUI, choose Power on the menu bar, choose Power Control in the navigation tree, click Power On in the right pane, and click OK in the displayed dialog box.

Download
Updated: 2019-01-08

Document ID: EDOC1100033003

Views: 7705

Downloads: 12

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next