Safety Precautions
Personnel Requirements
- Only qualified and trained electrical technicians are allowed to install and operate the PID module.
- Operators should understand the components and functioning of a grid-tied PV power system, and they should be familiar with relevant local standards.
Label Protection
- Do not tamper with any signs on the PID module enclosure because these signs contain important information about safe operation.
- Do not remove or damage the nameplate on the PID module enclosure because it contains important product information.
Installation
- Ensure that the PID module is not connected to a power supply and not powered on before starting installation.
- Install the PID module in an environment with good ventilation to ensure efficient and long-term system performance.
- Ensure that the PID module heat sinks are free from blockage.
- Do not touch any component inside the enclosure except the wiring terminals at the bottom.
Operation
Follow local laws and regulations when operating the device.
Maintenance and Replacement
- The circuit breaker on the PID module AC side is turned off in a SUN2000 scenario.
- The circuit breakers on the PID module DC and AC sides are turned off in a SUN8000 scenario.
- A faulty PID module requires overall maintenance. Contact the dealer if the PID module is faulty.
- Maintain the PID module with sufficient knowledge of this document, proper tools, and testing equipment.
- Wear electrostatic discharge (ESD) gloves and comply with ESD protection regulations during maintenance work.