No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

OSN 9800 V100 Configuration Guide 03

This document introduces service configuration process for OSN 9800.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Dependency and Limitation

Dependency and Limitation

This topic describes the dependencies and limitations of ETH PWE3 in the network design phase, and equipment configuration and commissioning phase.

Network Design Principles

Applicable Object Dependency and Limitation Remarks
Encapsulation mode for PW
  • Use the raw encapsulation mode for PWs.
  • If the Ethernet frames sent from the local AC contain one more layer of labels than those sent from the opposite AC, set the PW encapsulation mode to tag for the local AC and configure request VLAN and T-PID as required.

N/A

Configuration and Commissioning Principles

Applicable Object Dependency and Limitation Remarks
Ethernet service OAM

When Ethernet service OAM is used for ETH PWE3 packets, an MEP or MIP can only be created on a UNI port but not on an NNI port.

N/A

Translation
Download
Updated: 2019-09-05

Document ID: EDOC1100033663

Views: 18973

Downloads: 667

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next