No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

CLI-based Configuration Guide - VPN

AR100, AR120, AR150, AR160, AR200, AR1200, AR2200, AR3200, and AR3600 V200R010

This document describes VPN features on the device and provides configuration procedures and configuration examples.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Monitoring the L2TPv3 Tunnel Running Status

Monitoring the L2TPv3 Tunnel Running Status

Context

To check whether an L2TPv3 tunnel is running properly, view the status of AC and tunnel interfaces.

After an AC interface is bound to a tunnel interface using the link-bridge command, the status of the AC and tunnel interfaces are associated. The association between the AC and tunnel interfaces are as follows:
  1. If the physical status of the AC and tunnel interfaces is UP and the protocol status is UP (Spoofing), the status of the tunnel is UP.
  2. If the physical status of the tunnel interface is Standby (^down), the physical status of the AC interface is down or *down.

    Cause: No network cable is installed or the AC interface has been shut down.

  3. If the physical status of the AC interface is Standby (^down), the protocol status of a tunnel is down.

    Cause: Parameters of the tunnel are incomplete, the route is not reachable, no license is uploaded, or the tunnel has been shut down.

NOTE:

If parameters are changed, a tunnel is deleted. If the new configuration is correct, a tunnel will be established again.

Procedure

  • Run the display interface tunnel [ interface-number ] command to view the running status of the tunnel interface.
  • Run the display interface brief [ main ] command to view the brief interface status and configuration information.
Translation
Download
Updated: 2019-08-07

Document ID: EDOC1100033725

Views: 151135

Downloads: 367

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next