Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Electrical Safety

Electrical Safety

Observe the following electrical safety precautions:

  • To ensure device and personal safety, use power cables supported by the server.
  • The power cables are used only for the X6800. Do not use the power cables for other devices.
  • Before connecting or disconnecting cables, ensure that all external components are disconnected from the system power supply.
  • Disconnect all power cables when powering off the server.
  • Disconnect the server from the system power supply to avoid electric shocks before moving the server.
  • Before installing or removing a component, disconnect its power cable and then the signal cable. Disconnect the system power supply if needed.
  • Use only one hand to connect or disconnect a cable to avoid electric shocks that may occur when you touch two different electrodes with both hands.
NOTICE:

Contact service personnel to arrange for the installation of a protective earthing (PE) conductor from the separate protective earthing terminal to the protective earth wire in the building.

Place electrostatic-sensitive components such as mainboards and hard disks in ESD bags to prevent ESD damage. Observe the following ESD precautions:

  • Wear an ESD wrist strap when operating the server.
  • Check that all installation preparations are made before taking a component out of the ESD bag.
  • You can touch the metal shell of a component when it is stored in an ESD bag.
  • Hold a component such as a mainboard by its edge. Do not touch electronic pins or welding joints on the component.
  • Place a component on the ESD bag after taking it out of the ESD bag.
Translation
Download
Updated: 2018-08-28

Document ID: EDOC1100036738

Views: 9274

Downloads: 33

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next