No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

X6800 Server V100R005 User Guide 01

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Unpacking the Chassis

Unpacking the Chassis

This topic describe how to unpack the chassis before installing it. The chassis, CMAs (optional), and guide rails (optional) are independently packed.

Procedure

  1. NOTICE:

    The X6800 does not support preassembled transport, which may cause device damage.

    Check whether the outer packing and seals of the chassis are in good condition.

    NOTE:

    If the outer packing is damaged (for example, the outer packing is soaked or deformed, or the seals or pressure-sensitive adhesive tape is unsealed), keep the field evidence and provide feedback to the supplier or Huawei.

  2. Use a manual pallet truck to move the chassis to the equipment room, and take away the manual pallet truck. See Figure 3-2.

    Figure 3-2 Moving a chassis

  3. Unpack the chassis.

    1. Use a box cutter to cut the pressure-sensitive adhesive tape on the packing case.
      CAUTION:

      When using a box cutter to unpack a packing case, ensure that the knife edge is of a proper protrusion to avoid hurting hands or damaging the device in the packing case.

    2. Remove the packing case of the chassis, as shown in Figure 3-3. Table 3-3 lists items in the packing case.
      Figure 3-3 Removing a packing case of the chassis

      Table 3-3 Items in the packing case

      No.

      Item

      Quantity

      Description

      1

      Chassis

      1

      The chassis configuration depends on the contract.

      2

      Accessory box

      1

      The accessory box contains a warranty card, and a Quick Start Guide, and power cables.

      3

      Server node

      4

      The quantity and configuration of the server node depend on the contract.

    3. Remove a packing case of the CMAs. See Figure 3-4.
      NOTE:

      The CMAs are optional.

      Figure 3-4 Removing a packing case of the CMAs

    4. Remove a packing case of the guide rails. See Figure 3-5.
    NOTE:

    The guide rails are optional.

    Figure 3-5 Removing a packing case of the guide rails

  4. Check that the chassis and its components are complete and in good condition.
Translation
Download
Updated: 2018-08-28

Document ID: EDOC1100036738

Views: 9826

Downloads: 34

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next