Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying Device Installation

Verifying Device Installation

Operation Scenario

Verify device installation in any of the following scenarios:

  • A device is installed.
  • During troubleshooting

Precautions

To avoid device damage or personal injury, ensure that the chassis is powered off and the rack busbar is switched off before verification.

Procedure

  1. Check that the chassis is properly installed and does not shift, and that screws are tightened.
  2. Check that all server nodes are properly installed, and their ejector levers are lowered.
  3. Check that the PSUs are properly installed, and their ejector levers are lowered.
  4. Check that the fan modules are properly installed, and their ejector levers are lowered.
  5. Check that the management module is properly installed, and its ejector lever is lowered.
  6. Check that the I/O modules are properly installed, and their ejector levers are lowered.
Translation
Download
Updated: 2018-08-28

Document ID: EDOC1100036738

Views: 9779

Downloads: 34

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next