No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

X6800 Server V100R005 User Guide 01

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Powering On

Powering On

Operation Scenario

Devices and cables are properly installed.

Procedure

  1. Switch on the AC power distribution box (PDB) that maps to the chassis.
  2. Switch on the busbar of the rack.
  3. Power on the server nodes. For details, see the power-on sections of XH628 V5 Server Node V100R005 User Guide.
  4. Observe the status of chassis indicators.

    The chassis is powered on successfully if the PSU indicator is steady green.

Translation
Download
Updated: 2018-08-28

Document ID: EDOC1100036738

Views: 9244

Downloads: 33

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next