No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH628 V5 Server Node V100R005 Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Supercapacitor

Installing the Supercapacitor

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH628 V5.

  3. Place the server node on the ESD workstation.
  4. Remove the drive drawer.

    For details, see Removing the Drive Drawer.

  5. Take the spare part out of its ESD bag.
  6. Determine the position of the supercapacitor.
  7. Place the supercapacitor into the holder and push down smoothly until it is locked.

    Figure 4-16 Installing the supercapacitor

  8. Check whether the supercapacitor is configured with a TFM card.

    • If yes, go to 9.
    • If no, go to 10.

  9. Install the TFM card.

    1. Remove the screw-in RAID controller card.
      1. Remove the cables from the RAID controller card. See (1) in Figure 4-17.

        For details, see Internal Cabling.

      2. Loosen the screws that secure the RAID controller card. See (2) in Figure 4-17.
      3. Remove the RAID controller card from the connector on the mainboard. See (3) in Figure 4-17.
      Figure 4-17 Removing the screw-in RAID controller card
    2. Insert the TFM card into the screw-in RAID controller card. See (1) and (2) in Figure 4-18.
    3. Tighten the screws to secure the TFM card. See (3) in Figure 4-18.
    Figure 4-18 Installing a TFM
    1. Install the screw-in RAID controller card.

      For details, see Installing the Screw-in RAID Controller Card.

    2. Go to 11.

  10. Connect the cable between the supercapacitor and the screw-in RAID controller card.
  11. Install the supercapacitor holder.
  12. Install the drive drawer.

    For details, see Installing the Drive Drawer.

  13. Install the server node.

    For details, see Installing an XH628 V5.

  14. Power on the server node.

    For details, see Power-On Procedure.

Translation
Download
Updated: 2019-08-12

Document ID: EDOC1100036739

Views: 20513

Downloads: 24

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next